LNG Transfer equipment in use at V Power project in Thilawa, Myanmar

  • In the Myanmar project, the 28,000 cbm LNGC in the middle moored against the MFP was serving as FSU whilst the 18,000 cbm Moss vessel discharge to the FSU.a
  • The LNG as well as BOG were sent to the regas station onshore through subsea pipelines
  • The floating terminal provide a mooring pontoon per LNGC/FSU so she can come alongside and connect to the subsea BOG lines sending the Boil-off-Gas to shore.
  • The OEA MannTek LNG STS cargo transfer equipment was used to transfer from the NGC to FSU
  • Then again, Oak LNG STS cargo transfer equipment was used from FSU to MFP (barge)