LNG Surya Aki Optimoor STS Mooring Analysis

  • LNG Bunkering vessel alongside the mammoth semi-submersible Duel-Fuel heavy lift crane 'Sleipnir'
  • Operation was accomplished through STS equipment:
    2x 8" Hoses 25 meters in length
    One High Pressure N2 Cabinet (HPN2)
    One Emergency Shut Down System 1 & 2 Console (ESD)
    One Powered Emergency Release Couplings (PERC)
    Flanges and Gasket and Bolt Sleeves for Hose connection
    One Hose Bun & Sling
  • STS Expertize
    One LNG Captain
    Two Chief Engineers